China Standard High Precision Steel Hot Forging Service OEM Reducer Gearbox with CNC Machining Service differential gearbox

Product Description

 

Product Description

Basic information:

Model no customized Color as your demand
Blank Process china manufacturing steel forging Forging tolorance according to drawing
Machining Process CNC machining/lathing/milliing/turning/boring Machined surface quality according to your requirement
Machining Tolearnce from 0.005mm-0.01mm-0.1mm Surface treatment as your demand
Package for Steel forging Pallet or as your demand Transportation package pallets
Service for Steel forging metal parts solution as per customer’s drawing Trade mark none
Certifications ISO9001,IATF16949, HS code 7257190000
origin china    

    Our products main includes tracking shoes, flanges in engineering machines and steering knuckle in auto parts.
  Our business scope includes automobile, motorcycle and accessories, industrial equipment and components, manufacturing and processing machinery, metallurgical minerals and energy, hardware tools, transportation ect.we could manufacture as your demand.
Click this link for more products: product-list-1.html
 

Our Advantages

  Manufacturing capability covers the whole production process of forged parts, from mold design and manufacturing, forging, secondary processing, heat treatment, surface treatment to finishing, to provide customers with ready to use products and services.

 

Company Profile

  1. ISO16949 Quality Management System Certification Factory.
  2. We use advanced computer and technology (CAD) to design in manufacturing and mold manufacturing.
  3. Our 8000 ton JTLY hydraulic forging machine, with a cold impact force of 1600 tons, is a super large forging machine in China. Its main products are large axial precision forging and 100kg to 300kg, with an annual output of 30000 pieces.
  4. Our 2500 ton electric forging production line mainly produces 15kg to 30kg precision forging parts, with an annual output of more than 50000 pieces.
  5. Our company has a variety of processing equipment, can make their own molds and processing.
  6. Our company is equipped with a full set of heat treatment lines to ensure that your product quality is within our control.

Quality control: Strictly enforce the spirit of quality supreme excellence; fully implement ISO / 9001 quality management system; carry out incoming inspection of raw materials, production process control and product quality inspection
physical and chemical laboratory:It can realize tensile impact test, chemical composition test, metallographic structure, hardness and other tests at normal and low temperatures.

Certifications

Cooperative Partner

Exhibitions&Customers

Stock&Packing

FAQ

1:Are you a genuine manufacturer?
Yes, all products showed in our website are produced in our  certified factory; We are also a company registered by China Customs with the right to export and import.  

2: I want to keep our design in confidence; can we CHINAMFG NDA?
Sure, to protect customers’ profit is our obligatory responsibility, signed NDA would be valid to both of us.. 

3:What should I offer to get your quotation?
Please offer us your detailed information for the product, such as drawings with 2D/3D by software Pro/E, Auto CAD, SolidWorks, UG etc; as well as materials, surface treatment, quantity, package. Any special requirements should be highlighted especially for tolerance.  

4:How long is the manufacturing lead time?
Mass Production:30-45 working days after sample approval by yours.The lead time is the general production period without the transportation time.
We could make some special production arrangement effectively if customer has urgent need.

5:How long does it take to ship goods from China by sea?
It takes about 5 weeks to European ports plus 1 week customs clearance, so you can get the container within 6 to 7 weeks.It takes about 2 weeks to east coast and 3 weeks to west coast US ports.All sea goods are shipped from HangZhou Port.

6:How long does it take to ship goods from China by air?
It takes about 7 days to all major destinations.

7:What are the payment terms?
Payment terms are negotiable and will improve for long term customers.During the initial stages, we request 50% of tooling fee in advance with the balance payable on acceptance of samples.Production orders can be negotiable.We prefer 30% deposit and the balance by T/T before sails.But sometimes T/T15 days after sails would also acceptable.

8:New product development process
Got tooling order and sample order with 50% deposit—Hold a meeting with the relation dept.To ensure the developing schedule—Design mould, fixture and gauge and making them in our factory—mould.fixture and gauge making—producing samples—approved from customer-purchasing material-forging-heat treatment-shot blasting-machining-Inspection-package—delievery.

9:How to handle the complains?
–If happen any complaints after delivery,please just show us photos and detail compliants points, we will check with the production department and QC department Immediately and give you best solving solution which agreed by both of us.

Jackie Jiang is always at your service !

Tons of Our Manufaturing Machine: 8000tons
Do You Have ISO Certification: Sure ISO9001:2015
The Weight Range of Our Products: 0.5kg to 300kg
The Material We Use Usually: 45#,35#,40cr,42CrMo,30crmnsia
Could We Do OEM: of Course Yes
Transport Package: Pallet
Samples:
US$ 200/Piece
1 Piece(Min.Order)

|
Request Sample

Customization:
Available

|

Customized Request

gearbox

Steps to Replace a Faulty Gearbox in an Automobile

Replacing a faulty gearbox in an automobile is a complex task that requires proper tools, skills, and safety precautions. Here are the general steps involved in the process:

  1. Prepare the Vehicle: Park the vehicle on a flat surface and engage the parking brake. Disconnect the battery to ensure safety during the procedure.
  2. Drain Fluids: Drain the transmission fluid from the old gearbox into a suitable container.
  3. Disconnect Components: Remove any components obstructing access to the gearbox, such as the driveshaft, exhaust system, and linkage.
  4. Suspend the Engine: If necessary, use an engine hoist or support to suspend the engine safely.
  5. Support the Gearbox: Use a transmission jack to support the weight of the gearbox.
  6. Remove Gearbox: Detach the gearbox from the engine by removing bolts and disconnecting the clutch or torque converter.
  7. Install New Gearbox: Position the new gearbox onto the engine and secure it in place with bolts.
  8. Reconnect Components: Reattach the driveshaft, exhaust system, and linkage that were disconnected earlier.
  9. Refill Fluids: Fill the new gearbox with the appropriate transmission fluid according to the manufacturer’s specifications.
  10. Lower Engine: Carefully lower the engine back into its original position if it was suspended.
  11. Test and Adjust: Start the vehicle and test the new gearbox for proper operation. Check for any leaks, unusual noises, or gear shifting issues.
  12. Final Check: Double-check all connections and ensure that all components are properly secured.
  13. Dispose of Old Fluid: Dispose of the old transmission fluid safely and responsibly.
  14. Dispose of Old Gearbox: Properly dispose of the old gearbox according to local regulations.

It’s important to note that gearbox replacement can vary significantly depending on the vehicle’s make and model. It’s recommended to consult the vehicle’s service manual or seek professional assistance if you’re not experienced in automotive repair.

China Standard High Precision Steel Hot Forging Service OEM Reducer Gearbox with CNC Machining Service   differential gearbox	China Standard High Precision Steel Hot Forging Service OEM Reducer Gearbox with CNC Machining Service   differential gearbox
editor by CX 2023-09-13